Drave
Dam to Control River Flow
Date : 19-
Créateur :
Source : PANB Fraser Companies, Limited Collection
Collaborateur(s) :
Description : Logs are rushing through the openings of the dam which was built to control the river flow during the drive season.
Sujet : New Brunswick,Forests, Logging, Log Driving